Rollover or tap image to see magnified area.

  Item Reference: KCLCAL-1926-1927-220

Please note: The digitised calendars in this site have had their contents extracted using OCR (optical character recognition) and as a result, there may be occasional errors in the text. We are working on correcting these errors, but this may take some time.

Page content

FACULTY OF ENGINEERING 221 variable Expansion Gears-Stephenson Link Motion--Approximate and exact solutions-Radial Gears-Walschaert Joy Hackworth &c Balancing-Revolving Masses-Force and Couple Polygons-Un- balanced Forces on Bearings-Reciprocating Masses-Primary Balanc- ing- Inside and outside Cylinder Locomotives-Unbalanced Forces and Couples-Principles of Secondary Balancing Centrifugal Governors-Watt Porter and other types-Sensitive- ness-Effect of Friction Controlling Force Speed and Force Diagrams Isochronism Spring-Loaded Governors Effort and Power-Inertia Governors Z13-Engineering Drawing and Design Third-year Students of the Electrical Engineering Division attend one half-day per week until Easter Students of the Civil and Mechanical Engineering Divisions attend two half-days per week throughout the Session Designs &c in connection with Classes Zl0 and Z14 -Hydraulics Third Year One lecture per week throughout the Session Water Power-Water Wheels-Impact of Jets-The Pelton Wheel and other Impulse Turbines-Reaction Turbines-Speed Regulation -Centrifugal Pumps-Reciprocating Pumps-Water Hammer in Pipe Lines-Transmission of Power by Hydraulic Pressure-Accumulators -Resistance of Ships and the Principle of Dynamical Similarity- Flow of Gases through Orifices and Pipes Laboratory -One half-day per week throughout the Session including Strength of Materials -Advanced Theory of Structures and Structural Design Lent and Easter Terms -Two lectures and hours' design per week Continuous Beams general theory maximum moments on Spans subject to Live and Dead Load Reinforced Concrete Tee Beams-Doubly Reinforced Beams-Shear Reinforcement-Floor Systems-Columns and Footings-Arch Ribs- Chimneys
ARCHIOS™ | Total time:0.2573 s | Source:database | Platform: NX