Rollover or tap image to see magnified area.

  Item Reference: KCLCAL-1898-1899-768

Please note: The digitised calendars in this site have had their contents extracted using OCR (optical character recognition) and as a result, there may be occasional errors in the text. We are working on correcting these errors, but this may take some time.

Page content

cxxxvi FACULTY OF SCIENCE Explain how tunnels should be constructed through hill composed of clayey materials Also describe how tunnel- are made under water by employing the Greathead Shield State the main points to be considered in designing system of sewers for town State the main points in connection with water supply as to rainfall percolation evaporation absorp- tion storage in impounding reservoirs filtration softening distribution in towns previously prepared 10 Design and diagrams of strains for wrought iron bridge previously prepared 11 Diagrams of curves showing velocity of sewage in and discharge from brick sewers previously prepared 12 Calculations of strains in and profile of masonry dam for reservoir previously prepared 13 Design for waterworks service reservoir previously prepared 14 Design for undergronnd chamber with cast iron tubbing for sewage pumping station previously prepared XVI -Ctbtl ingtnccvtng SECOND YEAR How is the Plane Table employed in surveying What is the Three point problem υ Describe how Contract Section should be made for line of railway Sketch portion showing the usual data bridge has to be constructed across river The positions of the abutments having been fixed explain how the span can be ascertained by triangulation from measured base What are the main points to be observed in selecting the route for main road Sketch in cross section and describe how first class macadam road should be con- structed
ARCHIOS™ | Total time:0.0350 s | Source:cache | Platform: NX