Calendar: 1893-1894 Page 866
Please note: The digitised calendars in this site have had their contents extracted using OCR (optical character recognition) and as a result, there may be occasional errors in the text. We are working on correcting these errors, but this may take some time.
Page content
cxlviii faculty of science How can yoa determine the Meridian at place Ex- plain the relation between "Time and Arc Make sketch of the Planimeter and describe its use giving an example level road with 40 has to be raised 15 feet The gradients of the altered road are to be in 35 on one side and in 50 on the other At what distances will the altered road meet the existing road on both sides Make sketch of the Theodolite and explain all its adjustments 10 How are gaugings of streams and rivers made 11 State how the side widths for road or railway are set out and describe how the quantities in banks and cuttings are taken out 12 Plots of Surveys and Sections previously prepared 13 Description of the methods employed in setting out curves previously prepared 14 State the main points that have to be observed to prevent and to remedy Μ Slips" in banks and cuttings THIRD YEAR Describe generally the various sources from which the Water Supply of town can be derived and the character- istics of each What are the chief points to be kept in view in designing system of sewers for town design for Masonry Dam with the calculations upon which it is based previously prepared State the main points that have to be observed to prevent and to remedy Slips in banks and cuttings In the execution of masonry and concrete Sea Walls and Breakwaters explain some of the usual methods that are adopted in practice Give sketches Design for Sea Wall and Timber Groyne previously prepared
Further information
For further information about this page, please click here to contact us ›