Rollover or tap image to see magnified area.

  Item Reference: KCLCAL-1891-1892-844

Please note: The digitised calendars in this site have had their contents extracted using OCR (optical character recognition) and as a result, there may be occasional errors in the text. We are working on correcting these errors, but this may take some time.

Page content

Clvi ENGINEERING DEPARTMENT SECOND YEAR Essay previously prepared on Setting out Curves with the Chain alone and also with the Theodolite and Chain road with gradient of in 200 has to be made in cutting Calculate the 's of the road at the following distances on the Datum Line Distance in chains of ground in feet of Road to be calculated 00 17 50 G0 20 60 15 80 26 90 How is contour survey carried out in the field and afterwards plotted Describe how the distances and the heights of objects can be calculated trigonometrically from measured Base Line Explain generally the setting out of the Forth Bridge How are side widths set out on sidelong ground Make sketch of the Sextant and explain its use What is the difference in time between two places the one being 800 miles East of Greenwich and the other 500 West of it Sketch and explain the use of the Planimeter 10 Describe how Tunnels are set out and how Surveying is carried on under ground 11 Plot of Survey Sections and Cross Sections taken in the Field previously prepared FIRST YEAR Sketch an arrangement of chain lines to suit the survey on the Cartoon
ARCHIOS™ | Total time:0.0440 s | Source:cache | Platform: NX