Rollover or tap image to see magnified area.

  Item Reference: KCLCAL-1891-1892-843

Please note: The digitised calendars in this site have had their contents extracted using OCR (optical character recognition) and as a result, there may be occasional errors in the text. We are working on correcting these errors, but this may take some time.

Page content

engineering department civ -Ct&tl Srngmemng THIRD YEAR Essay previously prepared on Setting out Curves with the Chain alone and also with the Theodolite and Chain Describe how strains on Bridges are calculated The strain on the upper and lower Booms of Bridge being 100 tons sketch an arrangement of plates and angle irons that will serve Design for Dam for an Impounding Reservoir pre- viously prepared State the chief points to be observed in laying out and constructing main road Describe the main principles which have to be con- sidered in selecting source for the water supply of town Make sketches and explain how the drainage of house should be carried out including the internal arrange- ments Where town sewage has to be purified before its dis- charge into river mention some of the usual methods that are employed State how gaugings of large rivers and of small streams are carried out How is the 11 discharge מ found Describe the way to take observations at sea to de- termine surface and under currents depths nature of bottom and position of shoals Sketch concrete protective work for the toe of cliff exposed to heavy seas 10 What precautions have to be taken in setting cut Tunnels 11 Sketch an arrangement of platforms rails crossovers signals &c for double line of railway at local Station 12 How are slips in railway banks and cuttings avoided or remedied
ARCHIOS™ | Total time:0.0408 s | Source:cache | Platform: NX